Patch Up Modification Work on PERMAS Topside

Our scope of work entails the surface preparation, grouting and levelling of the electrical room roof structure of the PERMAS topside.

Project Details

  • Project Date: 27 May 2014
  • Location: Pulau Indah, Klang, Malaysia