Patch Up Modification Work on PERMAS Topside
Our scope of work entails the surface preparation, grouting and levelling of the electrical room roof structure of the PERMAS topside.
Project Details
- Project Date: 27 May 2014
- Location: Pulau Indah, Klang, Malaysia